Preview only. Sample data — not a live or published site. The domain copperstaterealtors.com has not been purchased. C13 LLC is not a real estate broker and does not represent buyers or sellers.

Last updated Nov 2026. Compiled November 13, 2026 (America/Phoenix). This is not an official list from any employer, utility, or city, and project details can change. Always confirm with the company or local government if a move depends on a start date or job location.

Areas at a glance

Use this simple map and the city list to see which directory areas sit near large employers. Pins are schematic, not exact street addresses.

North Phoenix

Directory cities: Phoenix (north), nearby Glendale and Peoria for housing.

  • TSMC Arizona semiconductor campus

East Valley

Directory cities: Mesa, Chandler, Gilbert, Tempe, Queen Creek, Sun Lakes.

  • Intel Ocotillo campus (Chandler)
  • CyrusOne PHX1–PHX8 (Chandler)
  • Meta, Google, Apple, EdgeCore, and Edged (Mesa)

West Valley

Directory cities: Goodyear, Avondale, Buckeye, Litchfield Park, El Mirage, Surprise, Peoria, Glendale.

  • Microsoft datacenters (Goodyear and El Mirage)
  • Vantage AZ1 campus (Goodyear)
  • Prime Data Centers PHX01 (Avondale)
  • Tract Buckeye Technology Park

Projects and campuses

City / area Company Project Status Source
North Phoenix (near Loop 303 and Interstate 17) TSMC (Taiwan Semiconductor Manufacturing Company) TSMC Arizona: a semiconductor campus of more than 1,100 acres. Company plans include six logic wafer fabs, two advanced packaging facilities, and an R&D center, with a July 2026 announcement of additional advanced-node fabs. Stated investment has grown to $265 billion. The first fab began high-volume N4 production in Q4 2024; the second fab structure was completed in 2025, with N3 volume production targeted for the second half of 2027; the third fab broke ground in April 2025 (N2 and A16, production targeted by the end of the decade); initial construction on a fourth fab and the first advanced-packaging fab started in early 2026. The City of Phoenix reported more than 3,500 employees in Arizona as of July 2026. Operating; expanding TSMC Arizona official page; City of Phoenix, July 16, 2026
Chandler (Ocotillo campus) Intel Fab 62, described by Intel as its sixth high-volume manufacturing facility at the Ocotillo campus in Arizona. An October 2026 Intel Foundry post said construction and tool installation were fully underway, with operations expected to begin by the end of 2028. Under construction Intel Newsroom, Naga Chandrasekaran
Chandler CyrusOne PHX1–PHX8 data center campus: eight facilities with 2,000,000 square feet of technical IT space and 169 megawatts of total IT capacity, with zero-water cooling highlighted by the company. Operating CyrusOne Chandler campus page
Mesa (Eastmark area) Meta Mesa Data Center. Meta announced on January 30, 2025, that the facility was serving traffic, with more than 200 operational jobs and a stated investment of more than $1 billion once fully built out. Construction partner DPR has described a five-building campus of over 2.5 million square feet. Operating Meta Data Centers, Jan. 30, 2025; DPR Construction project page
Mesa (Elliot and Sossaman roads) Google Mesa data center campus, previously known as Project Red Hawk, on a 187-acre site. Coverage of the 2023 groundbreaking described a $1 billion project planned at about 750,000 square feet at full build-out, with phase one then targeted for 2025 and later phases toward 2030. Salt River Project describes related electric infrastructure for a 187-acre data center at that location; Phase 1 power facilities are in service, with Phase 2 construction activity beginning in May 2025. In development / expanding Data Center Dynamics; Phoenix Business Journal, July 10, 2023; SRP Project Red Hawk
Mesa Apple Global command / operations center in Mesa’s Eastmark area, announced in 2015 as a $2 billion conversion of a former sapphire-glass plant into a data command center. Treated here as an established tech employer campus, not a newly announced 2026 project. Operating (established) CNBC, Feb. 2, 2015; Eastmark community page
Mesa EdgeCore Digital Infrastructure Mesa data center campus. A May 20, 2025 company release announced the purchase of an additional 43.87 acres and expanded capacity designed to deliver 450 MW+ . EdgeCore said it had constructed and commissioned 206 MW at its first Mesa campus (opened April 2023), with two more buildings then under construction for completion in 2025 and 2026, served by Salt River Project. Operating; expanding EdgeCore press release, May 20, 2025
Mesa (less than 20 minutes from downtown Phoenix) Edged US Edged Phoenix, a 36 MW waterless, AI-ready data center. The company announced a ribbon cutting on April 2, 2026, with Mesa city officials and the Mesa Chamber of Commerce attending. Operating (opened 2026) Edged US press release, April 2, 2026
Goodyear and El Mirage Microsoft Microsoft states that it operates datacenters in El Mirage and Goodyear as part of Greater Phoenix. Its community page says the newest West Valley AI datacenters will use no water for cooling, and that it projects 763 full-time employees and contractors across its operational Arizona facilities by the end of 2026. Operating; expanding Microsoft Local, West Valley datacenters
Goodyear (Bullard Tech Corridor) Vantage Data Centers Phoenix (AZ1) campus. A July 7, 2023 company release on the Phase II topping-out said the fully developed campus would offer 176 MW of IT capacity across three facilities totaling more than 1 million square feet, with a stated investment of more than $1.5 billion. Phase II was then scheduled to be operational in spring 2024. Campus developed in phases Vantage Data Centers, July 7, 2023
Avondale Prime Data Centers PHX01 hyperscale campus: five buildings, 66.5 acres, 1.3 million square feet, and 240 MW of critical IT load. Prime announced on May 21, 2026, that it had broken ground on the first three buildings (each 267,000 square feet and 48 MW). The company and Avondale’s mayor described a more than $3 billion investment. Buildings 1–3 were described as secured by a hyperscaler customer. Under construction Prime Data Centers, May 21, 2026
Buckeye (west side, near the Palo Verde area and Interstate 10) Tract Buckeye Technology Park, described on Tract’s project page as owned and in development: 2,019 acres and 1,800 MW of capacity, zoned for data center use and able to support multiple campuses. Local coverage in 2024 reported City of Buckeye approval of a development agreement for a large tech corridor project. Owned; in development Tract project page; ABC15 (city approval coverage)

Other projects are frequently reported in metro Phoenix (for example additional wholesale or hyperscale campuses). This table includes only items we could confirm on a public company, city, utility, or news page during this research pass. It is not exhaustive.